Drying

The drying stage follows processing. After processing the product needs to be pushed to the drying team. At the drying stage, a record must be maintained with the following information.

Field Description
Processing/production code Must select a processing code.
Date of drying Date the drying was initiated. Should default to today but editable. If they fail to select a value show the message "Please select a date"
Dry fruit quantity Must be numeric and in kilograms.

Take note of how to properly list products at this step product naming